Iso 8 cleanroom manufacturer in China? In order to maintain the required temperature, humidity, wind speed, pressure and cleanliness in the clean room, the most commonly used method is to continuously send a certain amount of treated air into the room to eliminate various heat and humidity interference and dust pollution in the clean room. To obtain the air in a certain state into the clean room, a whole set of equipment is needed to process the air, and it is continuously sent into the room, and part of it is continuously discharged from the room. This whole set of equipment constitutes a clean air conditioning system. Read even more info at iso 8 cleanroom.
Clean air-conditioning system is to control outdoor substances that affect the clean environment of clean rooms, such as dust, smoke, microorganisms, etc. It is a very important part in medical and health, food processing, and microelectronics engineering.
The clean air conditioning system is basically composed of the following equipment:
1. Heating or cooling, humidification or dehumidification and purification equipment;
2. Air conveying equipment and pipelines that send the treated air into each clean room and circulate it;
3. Provide heat, cold, heat source, cold source and piping system to the system.
This specification is formulated to implement important national guidelines and policies, creating standard construction acceptance requirements, unify testing workflows, and ensure project high quality, save extra energy, shield the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements.
The clean room workshop is also called the dust free workshop, gmp cleanroom, the industrial clean room (Clean Room) and the dust free room. It refers to the removal of pollutants such as particles, harmful air and bacteria in the air within a certain space, and the indoor temperature,cleanliness, indoor pressure, air velocity and air distribution, noise and vibration, lighting and static control. A specially designed clean room for a particular requirement. That is to say, no matter how the extemal air conditions change, the clean room can maintain the characteristics of cleanliness temperature and humidity and pressure.
In Africa, some area only require cooling system of the air conditioning unit. Especially at island country, the air humidity is very higher 80-90% of year average. For noodles, pasta production factory, the humidity should be control at 30-40%. Like this condition we recommend rotary dehumidifier air conditioner or independent dehumidifier with air conditioner work together.
For the unidirectional flow (laminar flow) clean room, the air supply volume is determined by the product of the average wind speed of the room section and the cross-sectional area, in which the measured section of the vertical unidirectional flow (laminar flow) clean room is the horizontal section 0.8m away from the ground; The horizontal unidirectional flow (laminar flow) clean room takes a vertical section 0.5m away from the air supply surface. The spacing of measuring points on the section shall not be greater than 2m, and the number of measuring points shall not be less than 10, which shall be evenly arranged. Hot bulb anemometer for instrument.
Generally, the air flow distribution point on the surface of the operating table or production equipment should be located at 2/3 of the distance between the clean room space and the partition wall, so that when the operator is working, the air flow can flow from the inside of the process area to the operation area, and the The dust is taken away; if the distribution point is arranged in front of the process area, it will become an improper airflow distribution. At this time, most of the air flow will flow to the process area, and the dust caused by the operator’s operation will be brought to the back of the equipment. As a result, the platform will be polluted, and the yield rate is bound to decrease.
Suzhou Pharma engaged in cleanroom turnkey project for many years, HVAC system design and installation is the main part in project. We supply air duct design, AHU solution and installation guide. Before we quote the equipment, the basic data is necessary, such as room clean grade, dimension and height, temperature and humidity request, the local highest/lowest temperature and humidity.
Clean shed, also known as clean work shed (dust-free shed, purification shed, operating table, etc.), is a small space surrounded by anti-static mesh curtains or plexiglass in the clean room, and HEPA and FFU air supply units are used above. It is composed of a space with a higher purification level than the clean room, and the clean room can be equipped with purification equipment such as air shower room and transfer window.
Airflow is the most important factor in controlling cleanliness and temperature and humidity, and it also has some influence on noise. Therefore, the wind speed measurement is the first step in the clean room test. The purpose of the wind speed measurement is to confirm that the air flow sent by the filter meets the design specifications, and the second is to confirm the uniformity of the air flow. In some occasions, due to site restrictions, the indoor ventilation volume must also be converted by multiplying the wind speed by the outlet area. Discover more information at https://www.sz-pharma.com/.
Governments of various countries have different requirements for clean design conditions, so attention should be paid to government requirements when designing. The choice of refrigerant should pay attention to whether it needs environmental protection type.
The cleanroom advantage include:
1. handmade sandwich panels can always be customized to meet every need,module width, module height are variable dimensions. no need cutout in the Installation site.
2. GMP double layer glass walls can customized.They allow to see into the production process and create a different working atmosphere.
3. LED lights reach UL standard.
4. For special hygiene requirements, our offers higher-quality integrated,hollow-profiles systems that prevent ingress of dire,air dust and moisture. Our design according to ISO14644-1 International standard.
Suzhou Pharma hope that in this new year, we have a new breakthrough in clean room technology, which can help more friends in need.