Recycled asphalt services in Loveland, CO

Grading services in Fort Collins? Excavation safety is a combination of safety precautions and mitigations in and around excavations and trenches to eliminate or control hazards in compliance with industry standards and regulations. Why is Excavation and Trench Safety Important? Excavation and trenching are amongst the most dangerous operations in the construction industry. Dangers can include cave-ins, falling loads, hazardous atmospheres and hazards from using heavy equipment. Regular pre-work inspections can reduce hazards and serious risk of injury. Safety inspections should check for the type of excavation being conducted, support and warning systems in place, access areas, weather conditions, heavy equipment and PPE.

When the housing market is buoyant there’s usually a high demand for building services, making it hard to find good builders at a reasonable price. It can be tempting to pick the cheapest builder who can start next week, but if a quote price is super-cheap there’s normally a good reason: perhaps they forgot to include something, or simply just got their sums wrong. Either way, the builder will realise they’re working at a loss. And if they walk off the job, it will cost you dearly to get someone else to finish it, with all the hassle that goes with that. It may be cheaper in the long run to go for a medium-range price rather than risk work being skimped to recoup losses, leaving you with a badly done job. If your project is not time critical, employing ‘friends of friends’ or friends on ‘mates’ rates’ may work. But more often than not something else will come up on the day when they promised to finish your job, which could then hold up the following trades.

Trenched areas sometimes have depleted oxygen levels, which is safety hazard that must be taken into consideration on excavation sites. The atmosphere in trenched areas can also be contaminated by toxic gases and chemicals. For these reasons, OSHA requires atmospheric testing to be performed by a qualified professional in excavations that exceed four feet. If atmospheric hazards are present, then workers must wear the appropriate respiratory protection equipment depending on the hazard in the excavated area. See additional info on Excavation services Windsor.

Get the first course right. Use a torpedo level to level each block front to back and either a 4-foot or 6-foot level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible. Even a small pebble on the surface of a block will throw the one above it out of alignment. And that crooked block will affect the one above it, and so on. That little stone could eventually create an unattractive hump in the top course.DO start with a good foundation. Your retaining wall will only be as strong its support system. For a stacked-block retaining wall that’s no higher than four feet, a trench filled with three inches of crushed rock will help keep the wall from shifting and settling. The exact depth of the trench depends on the proposed height of the wall, but follow this rule of thumb: Dig a trench to be an eighth of the wall plus three inches. For example, if you want the finished height of your retaining wall to be three feet (36 inches) tall, you’d need to dig the trench eight inches deep to accommodate three inches of crushed rock and about five inches (or an eighth of the visible retaining wall) to start the wall below grade.

If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning. Find extra info at https://stormheart.net/.